1.5oz LED Tube Light PCB Board Fabrication SMT DIP Flexible Aluminum Pcb
Min. Line Width | 0.075mm/0.075mm(3mil/3mil) | Surface Finishing | HASL |
---|---|---|---|
Copper Thickness | 1.5oz | Base Material | FR4 |
Min. Line Spacing | 0.075mm | Board Thickness | 1.6mm |
Min. Hole Size | 0.25mm | Soldermask Color | White |
Silkscreen Color | Black | Layer | 1-32L |
High Light | 1.5oz LED Tube Light PCB Board,SMT DIP Flexible Aluminum Pcb,1.5oz LED pcb board fabrication |
IBE provides better, faster and more cost-effective solutions to our customers' most challenging design for excellence (DFx) problems. From manufacturing to testing to supply chain, IBE provides customized design support to our OEM partners, enabling them to establish a strong competitive position within their marketplace.
We have a proven record of guiding manufacturers throughout the entire electronics manufacturing process. From simple designs to complex system integration, IBE provides the end-to-end electronics manufacturing services necessary to compete in a global marketplace.
Our Advantages:
1, Factory Area:60000㎡ Shenzhen factory; two other factories in US and Vietnam.
2, Quality Control:IPC-1-610E Standard,E-test,X-ray,AOI Test,IQC,QC,QA,100% Functional Test
3, PCB Making (Rigid, Flexible,Rigid-Flexible,Aluminium, High TG,Ceramic), Component Sourcing, SMT&DIP, Free Program & Test, OEM/ODM Serivce
4, Certifcation:ATF 16949,ISO 13485,ISO 14001,ISO9001,UL(E326838),Disney FAMA, CE,FCC,ROHS,
PCBA Capability
PCB Assembly Capability | |
Stencil size range: | 1560*450mm |
Min SMT package: | 0402/1005(1.0x0.5mm) |
Min IC pitch: | 0.3mm |
Max PCB Size: | 1200*400mm |
Min PCB thickness: | 0.35mm |
Min Chip Size: | 01005 |
Max BGA Size: | 74*74mm |
BGA Ball Pitch: | 1.00~3.00mm |
BGA Ball Diameter: | 0.4~1.0mm |
QFP Lead Pitch: | 0.38~2.54mm |
Testing : | ICT,AOI,X-RAY,Funtional test etc. |
Order Conditions
|
Standard Delivery Date
|
The fastest Delivery Date
|
Prototype ( <20pcs)
|
2days
|
8hours
|
Small Volume (20-100pcs)
|
6days
|
12hours
|
Medium Volume (100-1000)
|
3days
|
24hours
|
Mass Production (>1000)
|
Depends on BOM
|
Depends on BOM
|